Hybrid office guide for project teams
How each option is measured, what tested data looks like, and what to check before you put either one in a specification.
In a hybrid office, people come in to collaborate, run workshops and join video calls with colleagues and clients who are somewhere else. Concentration work, spontaneous calls and confidential conversations now share the same open floor, and noise quickly becomes the main complaint.
For fit-out contractors, interior designers and procurement teams, the practical question is how to provide private space for calls and small meetings: with freestanding acoustic pods, with glass partition walls, or with a combination of both.
This guide goes beyond a general comparison (for that, see our earlier article on office pods vs acoustic partitions). It shows how each option is measured, what tested data looks like, and what to check before you specify either one.
Quick comparison
| Acoustic pods | Glass partitions | |
|---|---|---|
| Best for | Phone calls, video calls, focus work, small meetings | Enclosed meeting rooms, boardrooms, department or executive spaces |
| Acoustic metric | Speech level reduction, D(S,A), ISO 23351‑1 | Sound reduction rating of the complete wall (STC or Rw) |
| Test result | ZUM‑S: 29.5 dB, Class B (SGS‑issued report, 2024‑09‑24) | Request STC or Rw data for the complete assembly, including the door |
| Installation | About 1 hour per pod | Prefabricated aluminium or steel profiles assembled on site; drawings and instructions supplied |
| Range | Office pods from single‑person booths to team meeting pods | L‑27, L‑65 and L‑100 systems, single or double glazing depending on the series |
| On‑site disruption | No wet trades or major construction | Low to moderate; ceiling and floor junctions need coordination |
| Relocation | Can move with the occupier | Demountable systems can be reconfigured; glass may need re‑sizing |
| Approvals | Confirm fire detection, sprinkler and egress requirements early | Confirm the same, plus ceiling junction details |
1. Speech privacy: how the two are measured
Measured by speech level reduction, D(S,A), under ISO 23351-1. It describes how much a standardised speech signal is reduced by the enclosure, in A-weighted dB.
| CLASS | A+ | A | B | C | D |
|---|---|---|---|---|---|
| D(S,A) | >33 dB | >30 dB | >25 dB | >20 dB | >15 dB |
Enclosures such as pods
The Explore Workspace ZUM-S acoustic booth (W1080 x D1000 x H2260 mm) was tested in a 200 m³ reverberation room under ISO 23351-1:2020. The result was a speech level reduction of 29.5 dB, which is Class B. The test was carried out at South China University of Technology and the report was issued by SGS (report no. GZIN2311000998CM01-1_EN, 2024-09-24).
The enclosure performs best in the mid and high frequencies, where much of speech intelligibility sits, and less well at 125 and 250 Hz. That is typical of lightweight enclosures: low-frequency noise such as equipment rumble is harder to block.
Two limits are worth stating plainly:
Explore Workspace office pods combine PET acoustic panels with 11 mm laminated glass, and include built-in ventilation, LED lighting and power outlets.
Partition performance depends on the whole system, not only glass thickness: the glazing build-up (laminated glass, double glazing with a cavity), perimeter and door seals, the door itself, and how the wall meets the ceiling and floor. A wall can be rated well on paper and still leak through the door gap or the ceiling void.
L-65 glass partition system
L-100 glass partition system
The Explore Workspace glass partition range covers the L-27 (single glazing, 27 mm profile), L-65 and L-100 (single or double glazing) series, with 10–12 mm glass in aluminium alloy or steel profiles. Because acoustic results depend on glazing, seals, door and ceiling junction, ask for the data that matches the exact configuration you plan to specify.
Takeaway: for individual calls and small meetings, a pod gives speech privacy measured to a recognised standard. For larger enclosed rooms such as boardrooms and training rooms, glass partitions provide the room volume and architectural presence. Compare each option using data that matches its own metric.
2. Flexibility, relocation and lease considerations
Hybrid offices keep changing: headcount, attendance patterns, layouts and sometimes premises.
- Acoustic pods are freestanding, so no wall construction is needed. They can be repositioned as team layouts evolve and moved with the occupier. Whether anything has to be made good at lease end depends on the lease and on how the unit is installed, so check with the landlord.
- Demountable glass partitions use aluminium or steel profile systems that can be taken down and reconfigured. Glass panels may need re-sizing for a different ceiling height or layout.
- Fixed drywall is permanent. It suits stable layouts but is the least adaptable.
3. Installation, disruption and approvals
Explore Workspace pods are designed to install in about one hour, so in an occupied office a pod can be placed without clearing an area for days.
Glass partitions follow a longer programme because profiles and glass are made to measure. Our standard lead times are about three weeks for profiles in regular colours (four weeks for custom colours) and two weeks for glass panels once measurements are confirmed, plus about four weeks in transit. Installation drawings and instructions are supplied, and lighting, sprinklers and detection near the wall line should be coordinated with the contractor.
Do not assume either option is exempt from approval. Enclosed spaces inside a larger floor can affect fire detection, sprinkler coverage, emergency lighting and escape routes, and the rules vary by country and building. Raise this with the building owner or fire consultant before ordering.
4. Cost factors to compare
Instead of a headline price comparison, compare what the budget has to cover:
- Purchase: unit or system price, glazing and finishes, door hardware, and for pods the power, lighting and ventilation.
- Installation and coordination: on-site labour, ceiling and services coordination, approvals.
- Programme: how long the area is unusable during the works.
- Change: the cost and effort of moving or reconfiguring later.
- End of lease: relocation, reuse or removal.
How a pod or partition is treated in accounts (furniture or building improvement) depends on its classification and the country, so confirm with an accountant rather than assume. For a wider view of fit-out budgeting, see our office renovation cost guide.
Sourcing from the manufacturer can simplify specification, customisation and delivery planning. Explore Workspace offers a one-stop service that runs from space planning and 3D design to manufacturing, delivery and support.
Boardrooms and executive roomsFormal meetings, presentations, larger groups Glass partitions with acoustic-rated doors and seals | Open collaborationTeam work, ambient chatter Acoustic wall and ceiling products, desk screens, baffles |
On-demand calls and focusQuick private calls, video meetings, solo focus Single-person pods and small meeting pods near workstation clusters | Breakout and loungeInformal discussion Soft seating, acoustic wall panels, mobile dividers |
Place pods close to workstation clusters so people can step into a private call without booking a meeting room.
Use a glass-partitioned room with an acoustic-rated door and display equipment, furnished from our meeting furniture range.
Absorptive panels, desk screens and baffles reduce reverberation and chatter. They improve the general environment but do not create private rooms.
There is no universal ratio. Start from peak attendance, the share of the day spent on video calls and how many people share each area, then add units if booking data shows queues.
Acoustic pods
Glass partitions
Frequently asked questions
No enclosure is completely soundproof. Pods are designed for speech privacy. In laboratory testing under ISO 23351-1, the ZUM-S achieved a speech level reduction of 29.5 dB (Class B). How private a call feels in practice also depends on background noise, whether the door is closed and where the pod is placed.
Explore Workspace pods include built-in ventilation fans and LED lighting. Always confirm with the building owner how the pod interacts with fire detection and sprinklers.
Demountable systems are designed to be taken down and reinstalled, and the aluminium or steel profiles and hardware can usually be reused. Glass panels may need re-sizing for a different ceiling height or layout.
There is no universal ratio. Start from peak attendance, call frequency and how many people share each area, then adjust using booking data.
It depends on the product, customisation, quantity and destination. For glass partitions, our standard schedule is about three weeks for profiles in regular colours (four for custom colours) and two weeks for glass panels once measurements are confirmed, plus about four weeks in transit. Contact us with your project details for pod schedules.
Planning a hybrid office project?
Send us your floor plan, target headcount and project requirements through the contact page. Explore Workspace supports projects from space planning and 3D design through manufacturing, delivery and after-sales support, and showroom visits are available by appointment.